Having purchased my welder and being the proud owner of it for all of five hours, my neighbor brought a proposal to me. The project is simple: make 20 squares out of rebar. 10, one foot squares, and 10, 1/4 metre squares.
I have to price the materials out tomorrow as it was too late to call concrete mixers this evening, but looking at the Lowes website, their cost would be $43.
should I purchase an abrasive disc and just cut them with a mitre saw? should I heat and chisel the lengths out? this determines how long the project will take, obviously. (wish I had a metal muncher!)
Does labor cost typically exceed materials cost for welding? I am at a loss because I have never had a comission welding before.
Thanks guys ;)