Its really hard to figure because the cost of the coal or gas,power,grind disc,wear and tear on tools,etc. I would have to agree with Finnr. At least twice the cost of material. $20 an hour being a rough figure. Keep in mind if you go to their house to take measurements and design something for their specfic needs that would be extra.