Glad to hear these hammers are going to be working in a shop and not going to scrap. Makes me sad to think of all the good equipment and vehicles that have been melted down. Thanks for saving them.

Link to comment
Share on other sites

Makes me sad to think of all the good equipment and vehicles that have been melted down.


I don't miss the vehicles, at least not those produced after about 1970. But the machinery and tools we're losing make me wanna cry. The old 'Made in USA' stuff was built to last. Back in the day it was about how well you could make something, not how cheap you could make it. Seeing all that quality steel going to the junkyard to be sent to Asia and melted down just breaks my heart.
bawling.gif

We're fools.
Link to comment
Share on other sites

It seems as though every scrap yard in Baton Rouge knew about this place and was hounding the last owners on a weekly basis to let them get in there and haul them off. I really don't know how they would have got the 400 out of there though. We used an articulated front end loader with a 12,000 lb tipping load capacity to lift these and transport them to the lowboy trailer. The rear tires were just floating when picking up the frame for the 400! On top of that they were located behind a house in a subdivision. Makes me wonder how they got those hammers back there in the 50's.

Link to comment
Share on other sites

Our tax structure is much to blame for this as depreciation means that a stout old tool totally paid for and ready to work another 50 years is due to depreciation making less money for a company than junking it and buying a new one that does the same job but you owe thousands on.

I had to take some economics and accounting classes for my degrees and this was the part of it I thought was voodoo...

Link to comment
Share on other sites

Makes me wonder how they got those hammers back there in the 50's.


There are some massive forklifts out there. When we were relocating one of Boeing's machine shops we used a 100,000 lb. capacity forklift to move many of the larger pieces of equipment. 100,000 lbs is the equivalent of 2 dump trucks filled with gravel.

The thing looked like an army tank with a pair of mammoth tusks sticking out the front. The wheels were steel with solid rubber tires, about 36" high and 24" wide. Weights are stacked on the back to increase load capacity. And it could expand in the middle to push the counterweights further back from the forks for more leverage. It looked similar to this forklift.

http://omegamorgan.c...y-moving-09.jpg

Omega Morgan was our subcontractor for this work. They can move anything.

One day they backed over one of our steel job boxes and flattened it like a paper sack! Amazing power in that machine.
Link to comment
Share on other sites

A local steel mill uses a 60 ton forklift to move it's big coils of steel.

I have dealt with contractors specializing in moving big things. They priced moving a 500,000+ pound bridge on Hilman rollers for me. They have moved 1,000,000+ pound structures in the past (lifted with Enerpacs, set on Hilman rollers and moved into place).

Link to comment
Share on other sites

  • 2 months later...

Got the cylinder/ram assembly mounted back on the frame. Opened up the cylinder and everything looks good inside with no broken rings or gouging. The frame was outside laying on its side for the last few decades after failed attempts of removal by the local scrappers. The whole upper assembly was kept under a carport out of the weather. I found a small brass plate on riveted on the frame marked G.S.A. 5-1931. Does anybody know what that might be? The General Services Administration was established in 1949...

IMG_1573Large.jpg
IMG_1571Large.jpg
IMG_1569Large.jpg
IMG_1570Large.jpg
IMG_1574Large.jpg

Link to comment
Share on other sites

I have all the originals but the got really screwed up by whoever disassembled the hammer years ago. The all thread is just temporarily holding the upper assembly in place - not under power :-)) I'll be using 1" grade 8's for the permanent ones. I love this hammer too! Just hope the compressor and reservoir can handle the hammer!

Link to comment
Share on other sites

Depends a lot on the condition of the hammer. I've had small steamers like this that could drain my 100CFM compressor with 500 gallon tank in no time. Had to close the shut-off to build back up. Remember; you can by-pass your compressor's after-cooler and run the hammer direct with hot/wet air. You probably don't have a problem with icing up, but it does have a bit more energy. Hammers built to run on steam have big clearances. Not just for expansion, but also to keep live steam flowing through them to keep them hot and prevent excess condensation.

To run hot air you run the pipe straight off the compressor to the hammer and put in a tee to the tank. I had great 20 HP Gardner-Denver two cylinder single stage compressor that put out 120 psi and just over 100 CFM and I'll bet that air was over 400 degrees!

Link to comment
Share on other sites

When I was checking out the piston and rings on the 400, I think the rings weren't any more than an 1/8" thick. I would imagine (with out a whole lot of wear) you wouldn't have more the an 1/3 of the piston ring thickness exposed outside of the piston groove while in the cylinder bore. This would give you around 0.042" clearance. This is just estimation though...
I measured my resevoir and it is a 600 gallon tank.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...