Jump to content
I Forge Iron

forge build


3lbhammer

Recommended Posts

Here is my new forge in progress. firepot model from thick cardboard. It is formed of four sections 11 inch length with 60 degree angles and 4 inch wide, four of these to be welded of 3/8 sheet steel. The forge is 39" X 24" I came across an old bed frame for the angle iron. It is a good source of angle iron. 100_2415-2.jpg100_2419-1.jpg100_2411-1.jpg

Link to comment
Share on other sites

I meant to do the mock up too but don't have the time. I'm picking up the steel for mine using the Fab. Mild Steel Firepot design that has been posted. I can torch out all the sections from a 5 foot piece of 3/8" thick by 6" wide flat stock from the local welding supply. They're charging about $25 for the piece. I bought a Centaur Clinker breaker to use with it. Please post pics as you progress with it. It would be great to see.

Rob.

Link to comment
Share on other sites

  • 3 weeks later...
  • 1 month later...

Greebe,
I plan to have a refractory of some sort on the table up to the level or a little higher than the fire pot and a side draft chemney. The whole now has welded angle iron on each side and the fire pot will be just set in the table and not welded in. I moved the pipe legs out to the corners from the original plan. I had planed to have a brick box and the whole forge set on it but changed my plan to just use the pipe as the legs and the 3/16 inch square as the bracing. It is quite ridged.

Link to comment
Share on other sites

Your tag team instructors, Dr Trial and Prof Error seem to be doing a good job about it. I might suggest some reading before their next practical though. The Lincoln and Miller websites have good information, and I have a link for the Army welding manual
http://www.metalwebn...rmy-welding.pdf

Have fun and keep at it. The forge looks good, I like how the fire pot lip lines up with the table lip.

Phil
http://www.metalwebnews.com/ed.html

Link to comment
Share on other sites

Phil thanks for your suggestions of the welding resources. I will look at them.
I you notice I have made some additions inspired by the forge build of Kevan in recent
posting. YOU can see the addition of a frame to the rear of the table to put a side draft chimney. The access channels are the same hight as the side rail of the table.
100_2456-1.jpg
100_2453-1.jpg

Link to comment
Share on other sites

Cool. I wonder if it would be easier to use firebrick? That way if you have a brick break you can easily replace it. Firebrick might be more costly though.

I just got finished repairing my little forge, and I can say that I am getting tired of refractories. I always seem to have cracking problems over time. I like working with solid fuels but I am getting tired of my forge. I need to just build a new one that is better I guess or go with propane.

Good luck on your forge. I will be looking forward to seeming how it turns out.

Link to comment
Share on other sites

Looking good so far! I went to smartflix.com and rented all of Steve Bleile's DVDs on welding and torch cutting. He covers alot of different processes and they use a camera with a welding filter on it to get some good shots of what a puddle should look like etc. I can sit and watch instructional videos like my wife watches the Kardashians (sp?) :-)

Link to comment
Share on other sites


Greebe,
I plan to have a refractory of some sort on the table up to the level or a little higher than the fire pot and a side draft chemney. The whole now has welded angle iron on each side and the fire pot will be just set in the table and not welded in. I moved the pipe legs out to the corners from the original plan. I had planed to have a brick box and the whole forge set on it but changed my plan to just use the pipe as the legs and the 3/8 inch square as the bracing. It is quite ridged.
Link to comment
Share on other sites

I'm glad I clicked on this thread! I am in the process of building a new forge myself and I love the idea of the firepot cut outs being bent down instead of cutting them completely out. Excellent! Excellent! I was thinking of welding a metal lip all the way around my pot but if I just bend those tabs out, I don't have to do that.

Great job....keep it up and keep us posted!

Dave

Link to comment
Share on other sites

  • 3 weeks later...

3lbhammer, here are my 2 cents.

I built a similar forge about 5-6 years ago. I also used some bed rail for the frame and legs, 3/8" plate for the firebox. The top of my fire box is level with the top of the table. I don't use refractory or firebrick on the table or the firebox and after all this time there is no sign of heat damage anywhere. My table is made of sheet steel, probably 14 gage, welded to the angle frame. There really isn't much load on it and it is holding up very well to regular use.

Link to comment
Share on other sites

  • 2 weeks later...

I've used firebrick to surface my forge, rather than refractory material - much less messy (as if that really matters . . . this is blacksmithing after all) I did learn that if you will use firebrick, you don't really need the thick stuff. You can use the 1 1/4 inch bricks to save on weight without significant sacrifice on the heat protection.

Also, definitely find a wholesale supply house to buy the brick from. I paid $1.45 per brick from a wholesaler, rather then $4.50 to $7.50 per brick from those theiving fireplace supply stores in my part of south eastern PA.

- Jim

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...