mat Posted November 11, 2010 Share Posted November 11, 2010 i have just started learning to weld and have bought an older type 200amp welder,copper transformer.the earth leed has 2 cuts in the insulation is this a problem?,can it be fixed?. Quote Link to comment Share on other sites More sharing options...
Fosterob Posted November 11, 2010 Share Posted November 11, 2010 Not a problem, If your worried you can tape it. I would tape it with black electrical tape more to keep the copper inside clean of dirt than for any other reason. Rob Quote Link to comment Share on other sites More sharing options...
mat Posted November 11, 2010 Author Share Posted November 11, 2010 thanks.just out curiosity would same apply to the electrode leed? Quote Link to comment Share on other sites More sharing options...
Mainely,Bob Posted November 11, 2010 Share Posted November 11, 2010 I would use heavy shrink tubing or a commercial splice on the electrode lead. The reason being the ground is what you want constantly connected to the work,Many times we have linked one bench to another or the work to the grounded bench by tacking bare steel across the gap and not created a life threatening hazard. The connection with the electrode you only want to happen when you want to strike an arc and weld,this is the lead that carries the amperage and heat.Electrical tape will unwind or unravel under numerous outside influences beyond your control and unless you use about a half roll of it is not meant to handle the type of stress or amperage we`re talking about here.Tape is a temporary fix,go with a long term answer to the problem on the hot lead. Quote Link to comment Share on other sites More sharing options...
maddog Posted November 11, 2010 Share Posted November 11, 2010 The cables are at low voltage compared to mains but with that kind of amperage behind them they are surprisingly dangerous. I once came a across a welding accident report in which two men were welding high up on the face of a building in a cage suspended from the roof. The welding cables were also strung from the roof. The cables were in poor condition. A bare patch on the hot rubbed against the steel cable supporting the hoist and melted it. Neither of them survived the fall. You really do want to do a first class repair. Quote Link to comment Share on other sites More sharing options...
Fosterob Posted November 11, 2010 Share Posted November 11, 2010 If the stinger lead or hot lead is cracked then as the others have said you should do a better repair on it. I like to use heavy heat shrink made for underground cable splicing. It is thick and has some sort of glue it it for waterproofing. The stuff is tough. If the lead is badly damaged you can turn it into another earth-ground lead or put a ground clamp on each end to do work off your welding table. That is also helpful if you are fighting arc blow sometimes. You dont want the hot to come in contact with anything other than the weld. If it is just hairline cracks the rubber is drying out and will loose chunks out of it sometime. Be careful. Rob Quote Link to comment Share on other sites More sharing options...
mat Posted November 11, 2010 Author Share Posted November 11, 2010 thank you all great advice Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.