I'm building a side blast forge out of 1/4" steel. It's 10" deep 20" wide and 30" long the fire will be 4" down and 5" away from the back wall. I will fill it with sand my question is will play sand be okay. And for the water tank would I be safe to use a galvanized bucket or will it get too hot