What is the minimum length of RR track that I can stand on end in a 5 gallon bucket? I have a few smaller pieces (12" and under) that I would like to stand on end in a 5 gallon bucket with concrete.
Here is what I was thinking with the smaller pieces. Add some sand or gravel to fill the bucket with and then add a plywood disc to whatever height I need and the stand the rail on end and add the concrete. Will this work?
Also, what type of concrete should I use? How much rail should stick above the rim of the bucket?
Thanks in advance for your help!