blackgrouse
-
Posts
8 -
Joined
-
Last visited
Content Type
Profiles
Forums
Articles
Gallery
Downloads
Events
Image Comments posted by blackgrouse
-
-
The spring piece is welded to a square post. This post is inserted into the square hardie hole. The hot forged piece is then placed between the upper and lower rods of the spring fuller. Then you hammer on the top rod which in turn will make a round notch in the piece you are forging.
What would work better for holding stuff is what is called a hold fast or hold down. I will be making one shortly and will get back to you. Just do a search for hold fast or hold down.
IMG 0303
in Tools
6Posted
Yes, I just caught on to what you mean that it would work for a person working alone in the shop because you wouldnt need a helper to hold the upper fuller. Sorry I was slow to pickup on that.