Jump to content
I Forge Iron

Bobb

Members
  • Posts

    12
  • Joined

  • Last visited

Posts posted by Bobb

  1. The I-beam I have is only 8 ft long so that is why I was going to hang it on one of the 6x6's. Mounted between two 4 in angle brackets fastened to the 6x6. I was going tosupport the I-beam from the top with a 1/2 in cable running back to the 6x6. I will try and post a diagram of my plan.
    As far as what I plan on lifting the capacity of the beam is only 1000lbs so I am limited.

  2. I am getting ready to put up a gib crane of sorts. It consists of a 6x3 in. 'I' beam. I going to attach onto one of wood 6x6's that are part of the framing of my shop. The trolley I was going to get from Northern tool. I am not sure about the method of lift, Chain hoist versus Cable winch. Does anyone have a preference?

  3. Hello everyone, since I am nursing sore elbowand I can visit my favorite web site with out feeling guilty that I should be in my shop. My name is Bobb and I hail mid Missouri. And proud to be in the company of fellow blacksmiths.

×
×
  • Create New...