Jump to content
I Forge Iron

Natural gas FARB gas injection?


JBarn

Recommended Posts

Hello everyone! I just started building my first forced air ribbon burner forge that will be ran on residential natural gas. My question is what is the best way to set up the gas orifice? I've looked around on here for an answer but can't find it yet. I'm running 2" pipe so I know the orifice has to be 18" from the burner but would it be ok for the orifice to be 26 inches away and what is the minimum size for a gas supply line I can run? Thank you!

Link to comment
Share on other sites

Forced air burners have different characteristics than NA burners. You don't need the same length of mixing tube if you set your gas discharge in a configuration that encourages mixing (either perpendicular or counter to the blower outlet direction). You can also put extra bends in your mixed fuel/air chamber to induce turbulence. 

That part is relatively easy. The difficult thing is deciding the NG line size you need. That is related to the actual gas pressure you have (residential can vary in a range), how long a gas line you run, and the BTUH rating of your burner.  For example, I  have a 1 1/2" line run underground some 100' feet to my detached shop, then a 1" line plumbed directly to my burner mixer.  I'm using a commercial burner, but homebuilts wouldn't be that much different. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...