dps9999 Posted November 30, 2015 Share Posted November 30, 2015 Hey guys just one quick question the regular JB Weld (NOT the quick set one). Once you mix it up how much time do you have to get everything in place before it sets up to hard to move stuff around? it says set time 4-6 hours but i can imagine having that much time to be able to slide and push things into place....i have used permatex "steel weld" a couple times and is sets up quick you gota rush to get everything in its place. I actually just ordered the Acraglas kit but i havent gotten it yet and need something now. but i am going to need more time than the permatex stuff so i figured jb weld cause i hear its suposed to be strong but i wanna make sure ill have enough time i dont like to rush and take chace of making a mistake...any info on how long you got to get things in place or any other tips or advice on the stuff would be appreciated! thanks guys Quote Link to comment Share on other sites More sharing options...
TacticallySharp Posted November 30, 2015 Share Posted November 30, 2015 Use devcon 2 ton. It will handle the job and sets in about 30 minutes. It workable in my area after about 8 hours. http://www.devcon.com/products/products.cfm?family=2%20Ton%C2%AE%20Epoxy Quote Link to comment Share on other sites More sharing options...
dps9999 Posted November 30, 2015 Author Share Posted November 30, 2015 something to look into thanks i apreciate it Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.