Jump to content
I Forge Iron

58er

Members
  • Posts

    405
  • Joined

  • Last visited

Everything posted by 58er

  1. I picked up a single port lever style Manzel oiler at quadstate, has anyone converted a lever style to a pulley style? thanks
  2. another question, pulled inspection plates off of side and am finding a very fine brass-like dust mixed in with oil....nothing big or even close to big, story with this hammer is that it was sent out and completely rebuilt about 20 years ago and then just moth balled until now. i cycled oil in it for about an hour with just a drill motor running the oiler before firing it up for the first time.... the thing runs perfect so im puzzled.....
  3. dont worry about anything other than the slacktub freezing, I'm not far from Trenton and leave my shop unheated. just heat up the metal and beat it.... youll be fine
  4. Thanks. Final details. Rearranging vise and air hammer. Built door hardware wife finished door and added landing dragon to peak.
  5. Does anyone know the actual recommended rotation for a Nazel 2b? Clockwise when addressing the hammer from the front? I don’t think it would matter. But ??? It appears to run fine in either I have chosen clockwise when addressing the hammer thanks
  6. I swear I could hear her giggling. What a hammer!! happiness is an oily hammer.
  7. Nah. Small price to pay to make a good friend happy.
  8. I know. He does it to me every time. Every time I forget he’s going to do it. Hehehehe.
  9. Thanks. Now on to the next!!
  10. SUCCESS!!!! Great to have friends with a hi lo.
  11. Tomorrow is moving day!!!! cant wait. Hopefully hammering by noon.....
  12. Getting close!! Siding 99%. door roughed in false hinges cut out. Electrical ready to go. Soon. Can’t wait!!!
  13. Power and lighting 90% i can see the light at the end of the tunnel...... no pun intended. Hopefully today start moving things back to their spots. Metal here tomorrow for roofing and siding
  14. Plywood on the walls , temporary door and the partition wall removed. Getting there
  15. My shops trashed. Moved monorail column and installed header to carry addition and allow me to open up wall. Have to wait for metal for that though.
  16. Ready for metal I need to go back to work to get a rest.
  17. Gettin there. Can’t wait. I think even the nazel is excited
  18. I appreciate the offer, thanks
  19. End of day 2 of building. I feel it’s not bad for one guy
  20. i will be opening up most of the wall.(entire length/7-8' high) i have to leave some to support the tie in of the new roof
  21. Poured concrete and 1 day into framing
×
×
  • Create New...