-
Posts
1,063 -
Joined
-
Last visited
Content Type
Profiles
Forums
Articles
Gallery
Downloads
Events
Status Replies posted by forgemaster
-
Hi Phill
Beaver here again i have decided where in my work shop im mounting my 2 CWT inslide Massey hammer I am going to mount my anvil on two thicknesses of 12 mm thick new conveyor belt and i think i will put one layer under the hammer body on top of foundations. I am also planing on using conveyor belt around the edge of the hole to isolate my floor from the hammer foundation/anvil block. The plan is to have a hole 2000 long 1500 wide and 2000 deep which is 6 cu metres. What are your thoughts thank you Beaver