#3
I had the pillow blocks on hand and the keyed shafting. I had to buy the vee pully to accept the v belt from the motor. Actually i think it's a weldahub. The idler I built from pipe and IIRC it has don dye bearings pressed into the ends.
I had the pillow blocks on hand and the keyed shafting. I had to buy the vee pully to accept the v belt from the motor. Actually i think it's a weldahub. The idler I built from pipe and IIRC it has don dye bearings pressed into the ends.
Recommended Comments
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.