Quantcast Anchoring gate into stone - Blacksmith Forum
Blacksmith Forum

I Forge Iron

Blacksmith and Metalworking Forum

 

Anchoring gate into stone

This is a discussion on Anchoring gate into stone within the Problem Solving forums, part of the Blacksmithing category; Many a house has my railings inside, I have been doing fence and gate work for a while but never ...


Go Back   Blacksmith Forum > Blacksmithing > Problem Solving

Register FAQ Calendar Search Today's Posts Mark Forums Read

Notices

Reply

 

LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 10-01-2006, 11:41 PM
Senior Member
 
Join Date: Jul 2005
Location: Berkeley Springs ,WV
Posts: 166
Default Anchoring gate into stone

Many a house has my railings inside, I have been doing fence and gate work for a while but never into fine stone masonry.I have just finished a gate that swings from the center, approximately 48in across. It is to be set into a hard sandstone, the posts I need to set into the first step are 1"square so need 1 1/4 inch holes and the sides or tops of these posts have brackets that anchor into the vertical surface with 1/2 bolts with lead anchors that need 7/8 inch holes. I have a stone mason drilling the holes.

I want to know how others would anchor this job and what mortar or epoxy would you use to fill and seal the holes around the posts into the first step. The stone is thick sandstone slab with big stone blocks on the verticals. No problem drilling. Mortar is currently black and I would like to keep the same look if possible. Is there a black mortar that has an epoxy base?

I dont' want to make any mistakes on this one, not only is the piece a real work and top notch, its also a big show piece as it will be seen in the heart of town by thousand of passersby.

Any thoughts would be appreciated.
__________________
Spare Time? Is that like day off? I've heard of those...never had one of my own.

Mark Schwenk- artist/blacksmith at Frog Valley Forge

http://www.frogvalleyforge.com
Reply With Quote
  #2 (permalink)  
Old 10-02-2006, 12:12 PM
Senior Member
 
Join Date: Mar 2005
Location: Rapid City, South Dakota
Posts: 617
Default

There is a product called "Rockite". You just mix it with water and pour it in, it sets in 15 minutes and is harder than concerte in 1 hour. It is a dark grey in color but some concrete pigment could be added to make it darker if needed. It expands as it hardens to make a completely tight fit. The Manufacturer is hartline Products Co. Inc., 4150 Mayfield Road, Cleveland, Ohio 44121, phone 216-291-2303. The product is commonly sold in lumberyards and hardware stores.

Woody
__________________
Never try to teach a pig to sing, it wastes your time and annoys the pig.

I do not suffer fools gladly.
Reply With Quote
  #3 (permalink)  
Old 10-02-2006, 03:03 PM
clark-kentski's Avatar
Senior Member
 
Join Date: Aug 2006
Location: fort lauderdale,florida
Posts: 136
Default

I saw this stuff at a trade show pretty amazing RhinoHide - All Weather Armor
Reply With Quote
  #4 (permalink)  
Old 10-02-2006, 11:23 PM
Senior Member
 
Join Date: Mar 2005
Location: New Braunfels, Texas
Posts: 1,343
Default

The old way was to use lead and I have done that several times with success - but the modern epoxies are hard to beat. A buddy of mine sets gates with Devcon and adds pulverized stone from the installation to the glue mix for a perfect match.
Reply With Quote
  #5 (permalink)  
Old 10-03-2006, 05:03 AM
Senior Member
 
Join Date: Mar 2005
Location: hillswick shetland isles uk
Posts: 270
Default

for restoration work i use lead and work a sq hole opened out at the bottom the lead will go black i use a mallet and take a set of stone dressing tools if there is some letting in to do ,on most listed buildings in the uk lead will be used and wrought iron, to remove old broken stubs use a core drill , we have worked on a job last year that used over 1000 kg of lead all run in hot ,and the iron work was all wrought iron we set a forge up on site and did the forge welds on site the job was cramps to hold masonry on a historic dock so some of the work depended on the tide ,i still have some work to finish of ,i havnt been well , its been a big job to be all wrought iron ,if you are working on stone that has a lot of work put into it , look after it , every mark will stand out ,warm a pice if iron up and dry out your holes before you run your lead
__________________
spelling and grammer inforcer
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


All times are GMT -4. The time now is 11:25 PM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.2.0