Good Ground connections for welding
When using a metal welding table, clamping the ground to the table work, and makes the entire table the ground. Place the work on the table, hit it with the stinger and go.
For some projects the current does not flow as well as I would like. What is your opinion of making a extension to go from the original grounding clamp to another (secondary) grounding clamp that can be attached directly to the project, or close to the weld zone? This could be nothing more than a set of jumper cables, clamp one end to the original grounding clamp and the other to the work.
Is this feasible to improve the grounding?
__________________
Tools do not make the blacksmith, the blacksmith makes the tools. gc
If someone questions your standards, they are not high enough.
|