I spent all day at the Cincinnati mill surfacing anvil billets. Yet one more day will be needed. All the big surfaces have been done and I'm in the process of doing the other 4 sides of each billet. It takes as much time to mount the billet as it does to do each side, but that sure wasn't true with the big flat surfaces. These were wavy from the rolling mill and it took four passes per surface to get the job done. A lathe job walked in and that work will probably be done on Saturday.










